Latest

Dresden funicular set to run again on 28 November

Dresden’s funicular is due to resume services on 28 November 2026, after its autumn inspection. Until then, a dial-a-ride taxi will replace the service to the White Stag.

The Dresden funicular is due to start carrying passengers again on 28 November 2026, after its autumn inspection. The first service is scheduled for 9am, according to Dresden Transport Company The route between Loschwitz and the the White Stag will remain out of service until and including 27 November for the scheduled inspection.

A dial-a-ride taxi will operate as a replacement during the suspension. According to the company, it runs every 30 minutes and must be booked by phone or through the transport operator’s app at least 20 minutes before the requested departure. At Körnerplatz passengers can board at the bus stop for services towards Schillerplatz; at the White Stag, the stop is near the entrance to the funicular’s upper station.

The inspection began on 16 November. According to the transport operator’s inspection plan, the haulage cable, tunnels and viaduct were among the items due to be checked. Brakes, controls, remote monitoring and the signalling system were also on the schedule. Minor repairs and cleaning were planned as well. Mitteldeutscher Rundfunk reported on 27 November that the inspection had been completed successfully.

The maintenance is part of a regular programme: according to the operator, Dresden’s two historic mountain railways undergo inspections twice a year. They have to be temporarily taken out of service for this work. The dates are arranged so that both systems are not out of service at the same time. While the funicular is being inspected, the neighbouring suspension railway can be used; it connects Loschwitz with Oberloschwitz and serves a different destination on the Elbe slopes.

The winter timetable for both railways has been in effect since 2 November. The funicular is due to run from 6.30am to 8.30pm Monday to Friday, and from 9am to 8.30pm at weekends and on public holidays. Dresden Transport lists daily services on the suspension railway between 10am and 6pm. The resumption dates are subject to how operations actually proceed.

The funicular runs from Körnerplatz to the White Stag. According to Mitteldeutscher Rundfunk, its history dates back to 1895. Dresden Transport describes both mountain railways as public transport and as attractions for visitors. The announced return of the funicular therefore affects both the link to the Elbe slopes and leisure travel at the start of Advent.

A film programme has been announced at the upper station for the period after services resume. According to Mitteldeutscher Rundfunk, films are due to be shown there daily from 28 November, in collaboration with the German Institute for Animation Film The screenings will complement the regular service and will not affect the published timetables for the railways.

Editor: Mira Cadena (Article created with AI assistance).

Sources