Regular train services are due to resume on three Saxon narrow-gauge railways on 21 November 2026, following a break of almost three weeks. The Saxon Steam Railway Company had suspended services on the Fichtelberg Railway, the Lößnitzgrund Railway and the Weißeritz Valley Railway from 2 to 20 November for maintenance work. Services are set to resume just before the Advent season.
According to the company, work on tracks, facilities and vehicles was planned during the break. Major repairs and routine inspections of steam locomotives were also on the programme. The period without services was also intended to be used for staff training.
The company invested around €370,000 in the three railways during the break, according to a report by the German Press Agency. Of that, around €200,000 went towards the Fichtelberg Railway, €90,000 to the Lößnitzgrund Railway and €80,000 to the Weißeritz Valley Railway. According to the report, most of the funding was provided by the Ostsachsen Transport Association and the Mittelsachsen Transport Association The expenditure therefore covers not only historic rolling stock but also the infrastructure on which the services operate.
For the Fichtelberg Railway between Cranzahl and Kurort Oberwiesenthal the operating company had announced, among other works, the replacement of a set of points at Kretscham-Rothensehma station. Worn sleepers were due to be replaced between Neudorf and Kretscham-Rothensehma. Several steam locomotives were also scheduled for major inspections at the workshop in Oberwiesenthal.
According to the company, a locomotive is dismantled into its component parts for this type of inspection. The boiler, running gear and frame are checked; the findings determine which parts need repair. Inspections and test runs follow reassembly. Regular boiler washing also removes deposits which, the company says, can impair heat transfer and increase coal consumption.
Work on a set of points at Kipsdorf station and on the software controlling a level crossing in Dippoldiswalde was among the work planned on the Weißeritz Valley Railway. The company announced bridge works on the Dippelsdorf embankment for the Lößnitzgrund Railway. The available information does not say whether every announced measure was completed before services resumed.
Evening Advent trips are also planned on the Lößnitzgrund Railway and the Weißeritz Valley Railway after the service break. According to the German Press Agency report, on the relevant days the Lößnitzgrund Railway is due to run from Radebeul Ost to Moritzburg and the Weißeritz Valley Railway from Freital-Hainsberg to Dippoldiswalde. These services will supplement the regular timetable during an important season for day trips.
The break also highlights the demands of operating the railways: historic steam technology requires workshop capacity, while tracks, points and crossings need maintenance regardless of the age of the vehicles. The coordinated closure made it possible to schedule this work without trains running.
Editor: Mira Cadena (Article created with AI assistance).